Baiya Phytopharm (2021)
Year 2021Design and construct new Pilot plant
for Covid-19 Vaccine production line

GPO-MBP (2012)
QC Lab extension 410 m2, Clearnroom: 200 m2 of Class C, 80 m2 of BSL – 2 Virology Testing Class C

Thai Otsuka (2008)
New I.V. Factory 7,500 m2, Cleanroom: 1,500 m2 of Class C General Electrical, BAS, Fire Protection, HVAC, Clean Dry Air, Steam, Purify Water

T-MAN (2016-2017)
New Pharmaceutical Building 13,000 m2, Cleanroom: 5,000 m2 of Grade D, 735 m2 Low Humidity area (40%RH)

Bionet Asia (2013-2014)
Supply & Install Cleanroom Grade D for Bio-Laboratory Facilities: HVAC system, Electrical, Cleanroom

Siam Toyota2 (2013)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower

Siam Toyota (2011)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower

Synergy Flavour (2012-2013)
Supply & Install Facility for Office, Flavours-Laboratory, and Flavours Production, Process Equipment Hook Up 1,800 m2

Synergy Flavor (2018)
Air condition (VRF, Spilt type)
Ventilation and Exhaust
Power supply, DB, Lighting,

Thai Meiji Pharmaceutical (2017-2019)
Crystallization and Drying room: AHU replacement
Cooling coil replacement for AHU
R&D area and Manager room renovation

Rodenstock (2015)
AHU 2-9 replacement (during new year shutdown) for plastic lenses production line New AHU, BAS, Duct work

YPC
Renovation for Cleanroom Class 100K, relocation and hook up Utility for Production line (2 factory).

Rodenstock (2014)
New process cooling and warm water. Design & installation cooling and warm water for new production line

BorgWarner (2017)
New Factory, Turbo assembly line, 6,000 sq.m. Air condition, Mechanical, Electrical, Machine hook up.

Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.

Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical

Siam Bheasach (2019)
Design and Built Pharmaceutical production line Class 100, 10,000, 100,000 Cleanroom.

Rodenstock (2017-2022) (2)
Toilet Building 2 & 3 renovation
Building 3 Renovation
Lighting, Air condition

Siam Bheasach (2015-2016)
Air condition replacement for Warehouse area
Water cooled Chiller 100 Ton and new FCU for Finished product warehouse

Rodenstock (2017-2022) (1)
AHU 2-12 replacement (New year 2018, shutdown)
Cleanroom Building 1 Modification
Air condition for Casting room improvement

Siam Bheasach (2011-2012)
Renovate Cleanroom Grade D 2,400 m2 of Grade D, 300 m2 Low Humidity area (20%RH)

Siam Bheasach Siam Pharmaceutical VECON (2020-2021)
Renovate and construct Pharmaceutical production line

Zuellig Pharma (2019)
Renovate and construct Pharmaceutical Warehouse with Temperature mapping for Medical devices storage

Global Power Synergy Public Co., Ltd (2022)
Construct new R&D and Pilot plant for GPSC Battery Factory