Project
![Baiya Phytopharm (2021)](http://enter.pirengineering.com/wp-content/uploads/2023/01/image-9.jpg)
Baiya Phytopharm (2021)
Year 2021Design and construct new Pilot plant
for Covid-19 Vaccine production line
![GPO-MBP (2012)](http://enter.pirengineering.com/wp-content/uploads/2022/07/nghrt.png)
GPO-MBP (2012)
QC Lab extension 410 m2, Clearnroom: 200 m2 of Class C, 80 m2 of BSL – 2 Virology Testing Class C
![Thai Otsuka (2008)](http://enter.pirengineering.com/wp-content/uploads/2022/07/utyr.png)
Thai Otsuka (2008)
New I.V. Factory 7,500 m2, Cleanroom: 1,500 m2 of Class C General Electrical, BAS, Fire Protection, HVAC, Clean Dry Air, Steam, Purify Water
![T-MAN (2016-2017)](http://enter.pirengineering.com/wp-content/uploads/2022/07/nmbmhg.png)
T-MAN (2016-2017)
New Pharmaceutical Building 13,000 m2, Cleanroom: 5,000 m2 of Grade D, 735 m2 Low Humidity area (40%RH)
![Bionet Asia (2013-2014)](http://enter.pirengineering.com/wp-content/uploads/2022/07/drew.png)
Bionet Asia (2013-2014)
Supply & Install Cleanroom Grade D for Bio-Laboratory Facilities: HVAC system, Electrical, Cleanroom
![Siam Toyota2 (2013)](http://enter.pirengineering.com/wp-content/uploads/2022/07/mnbmgh.png)
Siam Toyota2 (2013)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Siam Toyota (2011)](http://enter.pirengineering.com/wp-content/uploads/2022/07/ncnbgdf.png)
Siam Toyota (2011)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Synergy Flavour (2012-2013)](http://enter.pirengineering.com/wp-content/uploads/2022/07/nbfnfg.png)
Synergy Flavour (2012-2013)
Supply & Install Facility for Office, Flavours-Laboratory, and Flavours Production, Process Equipment Hook Up 1,800 m2
![Synergy Flavor (2018)](http://enter.pirengineering.com/wp-content/uploads/slider38/synergy-pic04.jpeg)
Synergy Flavor (2018)
Air condition (VRF, Spilt type)
Ventilation and Exhaust
Power supply, DB, Lighting,
![Thai Meiji Pharmaceutical (2017-2019)](http://enter.pirengineering.com/wp-content/uploads/2023/01/56237511_646754279113267_3990898192857169920_n.jpg)
Thai Meiji Pharmaceutical (2017-2019)
Crystallization and Drying room: AHU replacement
Cooling coil replacement for AHU
R&D area and Manager room renovation
![Rodenstock (2015)](http://enter.pirengineering.com/wp-content/uploads/2022/07/bvnbvmghm.png)
Rodenstock (2015)
AHU 2-9 replacement (during new year shutdown) for plastic lenses production line New AHU, BAS, Duct work
![YPC](http://enter.pirengineering.com/wp-content/uploads/2022/07/image_cover16.png)
YPC
Renovation for Cleanroom Class 100K, relocation and hook up Utility for Production line (2 factory).
![Rodenstock (2014)](http://enter.pirengineering.com/wp-content/uploads/2022/07/ngm.png)
Rodenstock (2014)
New process cooling and warm water. Design & installation cooling and warm water for new production line
![BorgWarner (2017)](http://enter.pirengineering.com/wp-content/uploads/2022/07/jmhjk.png)
BorgWarner (2017)
New Factory, Turbo assembly line, 6,000 sq.m. Air condition, Mechanical, Electrical, Machine hook up.
![Ekarat (2008-2009)](http://enter.pirengineering.com/wp-content/uploads/2022/07/dsadc.png)
Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
![Triumph Aviation (2005)](http://enter.pirengineering.com/wp-content/uploads/2022/07/bfdfd.png)
Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
![Siam Bheasach (2019)](http://enter.pirengineering.com/wp-content/uploads/2022/07/6.png)
Siam Bheasach (2019)
Design and Built Pharmaceutical production line Class 100, 10,000, 100,000 Cleanroom.
![Rodenstock (2017-2022) (2)](http://enter.pirengineering.com/wp-content/uploads/slider34/Rodenstockyear-type01-pic01.jpeg)
Rodenstock (2017-2022) (2)
Toilet Building 2 & 3 renovation
Building 3 Renovation
Lighting, Air condition
![Siam Bheasach (2015-2016)](http://enter.pirengineering.com/wp-content/uploads/2022/07/csdsa.png)
Siam Bheasach (2015-2016)
Air condition replacement for Warehouse area
Water cooled Chiller 100 Ton and new FCU for Finished product warehouse
![Rodenstock (2017-2022) (1)](http://enter.pirengineering.com/wp-content/uploads/slider34/Rodenstockyear-type01-pic01.jpeg)
Rodenstock (2017-2022) (1)
AHU 2-12 replacement (New year 2018, shutdown)
Cleanroom Building 1 Modification
Air condition for Casting room improvement
![Siam Bheasach (2011-2012)](http://enter.pirengineering.com/wp-content/uploads/2022/07/image-110-1.png)
Siam Bheasach (2011-2012)
Renovate Cleanroom Grade D 2,400 m2 of Grade D, 300 m2 Low Humidity area (20%RH)
![Siam Bheasach Siam Pharmaceutical VECON (2020-2021)](http://enter.pirengineering.com/wp-content/uploads/2022/07/5.png)
Siam Bheasach Siam Pharmaceutical VECON (2020-2021)
Renovate and construct Pharmaceutical production line
![Zuellig Pharma (2019)](http://enter.pirengineering.com/wp-content/uploads/slider32/ZuelligPharma-pic01.jpeg)
Zuellig Pharma (2019)
Renovate and construct Pharmaceutical Warehouse with Temperature mapping for Medical devices storage
![Global Power Synergy Public Co., Ltd (2022)](http://enter.pirengineering.com/wp-content/uploads/2022/07/Frame-ต้นแบบ.png)
Global Power Synergy Public Co., Ltd (2022)
Construct new R&D and Pilot plant for GPSC Battery Factory