Global Power Synergy Public Co., Ltd (2022)
Maptaput, Rayong
Year 2022Construct new R&D and Pilot plant
for
GPSC Battery Factory
Work scope
- Dry room (Very low humidity room, Dew point -40C)
- Air condition
- Electrical, Fire alarm, Access control,
CCTV, LAN - Electrical, Fire alarm, Access control,
CCTV, LAN - Cleanroom Wall & Ceiling
- Sanitary, Plumbing, Drainage system
- Fire protection
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
Project Reccommend
GPO-MBP (2012)
QC Lab extension 410 m2, Clearnroom: 200 m2 of Class C, 80 m2 of BSL – 2 Virology Testing Class C
Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}